Chartering

Ship Agency

Sale & Purchase

Ship Management

Ship Operation   

  Port Information

  Weather








Korean Port Information

DONGHAE

WEATHER

 

 

1) INTRODUCTION
  The port of Tonghae is located on the around middle part of the eastern coast of Korean Peninsula and it has been still well known as "Bukpyung" worldwide on marine charts, but Tonghae is the official name of this port. Tonghae port was first partly opened in 1978 primarily for the export of and for the local seaborne transportation of bulky and clinker cement.

2) APPROACH AND ENTRANCE
  No approach channels. Port entrance is covered by two breakwater. The approaches are also indicated on BA chart 882 and Korean chart 141. 

3) TIDES AND WEATHER
  Tonghae port confronting with the East sea is under the direct influence of the open sea. Occasionally, easterly sudden gales without warning do cause very heavy swell in outer harbour, swell in outer harbour, rendering very dangers and unstableness for all vessels lying at outer anchorages. 
Especially, strict caution should be taken all the time during the period from December to March in winter season. 
Dense fogs frequently occur from mid-May to mid-July, sometime deteriorating visibility of less than 100m, but duration not too long. 

4) PILOTAGE
 

Pilot station 37°30′00″N 129°12′00″E. 
Pilotage is compulsory. Two competent pilots. 


5) PORT ADMINISTRATION
 

The port is administered by all governmental agencies including Tonghae District Maritime and Port Administration (KMPA, Tonghae). Quarantine, immigration, customs are in service all the time. 


6) QUARANTINE
  Quarantine anchorage 1,450m off the south end of the north(outside) breakwater with circle of 500m in diameter. 

7) COMMUNICATION
  VHF CH 12 is available between vessel and harbour control. 

8) ANCHORAGE
 

There are total 10 anchorages in outer harbour limit. These anchorages are used only for waiting berths where no cargo operations is done. 


9)BUNKERING
  No bunker storage tanks around here, Barge should carry bunkers from Ulsan or Pusan whenever demanded. 

PIER LENGTH(M) DEPTH(M) BERTHING
CAPACITY(DWT)
BERTH CARGO
SOUTH 270
270
270
270
202
11.8
11.5
11.4
12.2
10.0
50,000
50,000
50,000
50,000
20,000
11
12
13
14
15
CLINKER
BULK CEMENT
BULK CEMENT
BULK CEMENT
BULK CEMENT
NORTH 270
270
270
195
185
11.8
11.8
9.8
9.0
8.0
50,000
50,000
50,000
20,000
10,000
21
22
23
24
25
GENERAL CARGO
BULK CEMENT
BULK CEMENT
PASSENGER, G.CARGO
PASSENGER
COAL  270 12.5 50,000 10 COAL
CENTRAL 270 12.3 50,000 30 G.CARGO
WESTERN 195
205
8.0
8.0
3,000
20,000
41
42
 
CONTAINER, G.CARGO